Description
AMICO HIGH PRESSURE GAS HEADER BAR
Amico_Header_Bar_Specs PDF
General Specifications:
- The header bars shall be equipped with emergency high
pressure shutoff valves to allow for emergency isolation of
the header bars. The header bar shall incorporate integral
check valves for each station.
- NOTE: The header bar comes with universal mounting
brackets to be mounted direct or with a 12” wall spacing
when the optional wall mounting bracket is used. The header
bar mounting brackets are optional accessories.
- All header bars and pigtails shall be cleaned for oxygen
service.
- All Language is NFPA compliant
- Lead time is 10-12 business days

Reviews
There are no reviews yet.